Hero image

Best decking experts in Spring Hill

Post a job now to get quotes from local decking experts

    Product Review
    Star

    Top Spring Hill decking experts near you

    Browse top Decking Expert experts with top ratings and reviews

    4.9
    Average rating of decking experts in Spring Hill based on 488 reviews of 40 businesses.

    View more decking experts

    Popular decking jobs in Spring Hill

    • Decking job

      Posted by Engine

      18 Apr 2024
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Spring Hill, QLD
      Job Description: Hi! Can you please attend and quote for a makesafe on the balconies of the following units. The balcony railings are loose and not safe. I can allow access to units 7,8,11,12 and 13 for a general quote. We do not manage 9 or 10.
      Decking service needed: Repair existing deck | Type of decking material: Hardwood | Approximate square meters of deck: I'm not sure | When: Any time that works
    • Decking job

      Posted by Engine

      24 Jan 2024
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Spring Hill, QLD
      Job Description: I need a quote to replace a deck - current floor is thick fibre cement flooring.
      Decking service needed: Repair existing deck | Type of decking material: I'm not sure | Approximate square meters of deck: I'm not sure | When: Any time that works
    • Decking job

      Posted by Engine

      18 Dec 2023
      • Mobile Verified
        VerifiedInformationPhone number has been verified
      • Mobile VerifiedMobile
        Phone number has been verified
      Location: Spring Hill, QLD
      Job Description: Is it possible to get a quote from this scope of works? BACK DECK AND STAIRS: - Order and supply skip bin (location to be confirmed on the day). - Source new building materials. - Freight and delivery of new building materials to site. - Block off entry to the back deck for the respective tenants for safety reasons. - Remove and dispose of the existing timber balustrading. - Remove and dispose of the existing decking boards. - Prep areas for the new deck installation. - Supply and install new H3 treated pine posts for the new handrail on the back deck. - Supply and install new 90 x 19mm merbau pre-oiled decking boards to the back deck. - Supply and install new H3 treated pine top rail bread loaf baluster. - Supply and install new H3 treated pine bottom rail baluster. - Supply and install new H3 treated pine 62 x 18mm vertical slatting baluster's. - Construct the new staircase and handrail in accordance with the relevant Australian standards. - Merbau decking boards to be connected to the existing joists with stainless steel decking screws countersunk. - Handrail balustrading to be connected to the posts with galvanised/stainless steel fixings. - All rubbish to be installed in the supplied skip bin at the front of the property. - Remove and dispose of all rubbish created. - Clean all areas worked in. - Removal of supplied skip bin. - Source paint matches as per the original balustrading. - Prep all areas. Supply and apply matched paints to the new balustrading as per the original colour scheme. BACK STAIRS ONLY: - Remove and dispose of the existing handrail balustrading on the back stairs. - Remove and dispose of existing staircase stringers and step treads. - Source new construction materials. - Supply and install new steel galvanised stringers. - Supply and install new treated pine step treads fixed to the new galvanised stringers with galvanised bolts. - Supply and install new H3 treated pine 88 x 88mm post on the bottom step for the new handrail. - Supply and install new pole plate post against the existing wall for the new handrail. - Supply and install new H3 treated pine top rail bread loaf baluster. - Supply and install new H3 treated pine bottom rail baluster. - Supply and install new H3 treated pine 62 x 18mm vertical slatting baluster's. - All cut ends to be primed with an enamel primer. - Construct the new staircase and handrail in accordance with the relevant Australian standards. - Disposal of all existing rubbish created. - Clean all areas worked in. - Re-attend property. - Prep all areas. - Supply and apply builder's white paint to the new handrail. - Supply and apply matched paint of the original stringers to the new step treads.
      Decking service needed: Replace existing deck | Type of decking material: Thick fibre cement flooring | Approximate square meters of deck: I'm not sure | When: Any time that works

    Get the right price for your job

    The Oneflare Cost Guide Centre is your one-stop shop to help you set your budget; from smaller tasks to larger projects.

    Browse decking experts by suburb

    View suburb directory

    Popular searches on Oneflare